2016 - Present

2016

Detail Design

Exhaust Scrubber for GL Bulk Carrier

"Lee A Tregurtha"

"Cleveland Rocks"

Conversion to Self-unloading Cement Carrier

"Commander"

2016-2018

Contract Plans & Specifications, Regulatory & Detail Design

  • "Cleveland Rocks" Conversion to Self-Unloading Cement Carrier "Commander"

2017

Detail Design

  • Keel Cooler Installation for Tug "Bradshaw McKee"

  • Reduction Gear Installation for Tug "G.L. Ostrander"

Calculations

  • FEA Analysis for Pin Connector on Tug "Victory"

2018

Condition Analysis

  • Analyze Machinery Operating Conditions for 46 CFR Section 58.01-40 Compliance-Interlake Steamship Fleet

Detail Design

  • Revised Raised Pilothouse for Tug "Invincible"

  • Accommodation Modification for Barge "Menominee"

FEA Analysis

  • Hopper Barge FEA

2019

Concept, Detail Design & Contract Plans

  • FBS Hull #3788 - Self-Unloading Bulk Carrier for Great Lakes and St. Lawrence River Service

Reduction Gear Installation, Towing Winch Removal & Stability Test for Tug

"G.L. Ostrander"

Tug "Victory" Connector FEA

In need of a Naval Architect or Marine Designer?

 Call Now: 920.743.8282 

253 North First Avenue Sturgeon Bay, WI 54235

© 2016-2021 Bay Engineering, Inc.| All Rights Reserved